博客栏目停服公告
因网站改版更新,从9月1日零时起美国中文网将不再保留博客栏目,请各位博主自行做好备份,由此带来的不便我们深感歉意,同时欢迎 广大网友入驻新平台!
美国中文网
2024.8.8
|
This article mainly introduces JCB Backhoe Loader Power Sideshift - Wear Pad Renewal
JCB Heavy Duty Truck Diagnostic Tool JCB Electronic Service Tool with JCB ServiceMaster42023.09
Inspection (1000 hours)
When the wear pads are worn to 6 mm (0.23 in) or below they should be replaced.
It
is permissible to rotate the top wear pads 180° to prolong service
life, provided the contact surface is more than 6 mm (0.23 in) thick.
Note: If rotating the wear pad the grease nipples will have to be swopped over. Dismantling
1
Park the machine on firm level ground, engage the
parking brake and set the transmission to neutral.
Lower the loader arms to the ground.
2
Set the carriage fully to end of travel A, shown in centre position for clarity.
3
Lower the bucket to take the weight off the kingpost.
4
Switch OFF the engine and remove the starter key, operate the control levers to vent residual hydraulic pressure.
5
Unlock top lock tab B and unscrew nut C.
6
Remove bolt D through the slot in the rail E.
7
Hydraulic clamp F and washer G should remain in position.
8
Remove plate J and wear pad H.
Assembly 03.2024 JCB ServiceMaster4 v24.3.1 Diagnostic Software with SW Files 9 Fit wear pad H, plate J and bolt D.
10
Fit new lock tab B and fit nut C.
11
Set the hydraclamp clearance as described in Sideshift - Hydraclamp Clearance Setting.
12
Repeat procedure steps 5 to 11 for the bottom clamp.
The only difference on the bottom clamps is the wear
pad is on the opposite side of the rail from the top
clamp so bolt K need not be completely removed.
Note: If the wear pad is trapped between the rail and
carriage, lower the bucket to relieve the load on the wear pad.
13
Lift the bucket and set the carriage to the opposite end of the travel, repeat the procedure for opposite side.