注册 登录
美国中文网首页 博客首页 美食专栏

lucas88的个人空间 //www.sinovision.net/?642492 [收藏] [复制] [分享] [RSS]

x

博客栏目停服公告

因网站改版更新,从9月1日零时起美国中文网将不再保留博客栏目,请各位博主自行做好备份,由此带来的不便我们深感歉意,同时欢迎 广大网友入驻新平台!

美国中文网

2024.8.8

分享到微信朋友圈 ×
打开微信,点击底部的“发现”,
使用“扫一扫”即可将网页分享至朋友圈。

ISUZU TRUCK ENGINE (4JJ1 model) Disassembly of the Assembly

已有 259 次阅读2024-6-19 02:46 | ISUZU 分享到微信

This article introduces ISUZU TRUCK ENGINE (4JJ1 model) Disassembly of the assembly


ISUZU IDSS MX2-T Diagnostic Adapter System Support G- IDSS/US-IDSS/E-IDSS (Included DHL Shipping)

Precautions when installing or removing the engine Always apply chock blocks to the vehicle wheels.
Select an engine hoist that is able to withstand the weight of the engine.
Do not get under the engine while it is hoisted.
Never put your hands where they can get easily caught.


1. Disconnect the battery cable negative terminal.


2. Drain the engine coolant.


3. Remove the starter. Refer to "Starter Motor"in Section 1E, Engine Electrical.


4. Remove the front exhaust pipe and exhaust brake.
Refer to "Exhaust Pipe"and "Exhaust Brake"in Section 1G, Engine Exhaust.

5. Remove the transmission. Refer to "Smoother Transmission Assembly"in Section 5B, Automatic Transmission (Smoother) for details on the Smoother vehicles.
Refer to "Transmission Assembly"in Section 5C, Manual Transmission, for details on M/T vehicles.


6. Remove the air intake pipe and hose. Remove the hose on the intercooler side.
Remove the pipe from the turbocharger with the hose attached.



7. Remove the air duct and PCV hose.


8. Disconnect the boost sensor connector (1) and harness clip.

9. Disconnect the ECM connector and clip.

04.2024 ISUZU G- IDSS Truck Diagnostic Software Download & Installation

 
10. Remove the air intake duct and hose.Remove the duct on the intercooler side.
Remove the duct from the intake throttle valve with the hose attached.



11. Remove the radiator upper hose.

12. Remove the A/C compressor. Remove the A/C compressor drive belt.
Remove the compressor from the A/C compressor bracket. Fasten to any uitableposition with a wire along with the hoses.

13. Remove the engine ground cable from the frame.

14. Remove the vacuum hose (1) from the vacuum pump (2).





15. Remove the radiator lower hose at the engine side.

16. Remove the fan guide. Refer to "Water Pump" in Section 1C Engine Cooling.


17. Remove the cooling fan assembly.


18. Remove the power steering pump. Remove the power steering pump at the engine side with the hose attached. Fasten the power steering pump with hose attached to any suitable position with a wire.


19. Disconnect the heater hose (2) from the heater pipe (1).

04.2023 ISUZU E- IDSS Diagnostic Software Download and Installation Service




20. Install the engine hanger. Remove the EGR valve harness clip (1).Install the engine hanger to the rear left side of the engine.
Special Tool Engine hanger: 5-8840-2861-0






21. Remove the fuel hose. Drain the fuel from the fuel filter. Remove the hose at the fuel filter side.









22. Remove the mounting bolts on the chassis frame side of the engine mount.
Before removing the engine mount, use the hoist to suspend the engine.
Legend




1. Leaf rigid suspension


2. Wishbone suspension


23. Remove the engine assembly.


Slowly operate the hoist to raise the engine to the top surface of the chassis frame.


Turn the engine 90° and move it from the chassis frame top surface to remove the engine assembly.



.ZS IDSS II Truck Diagnostic System Download andInstallation


免责声明:本文中使用的图片均由博主自行发布,与本网无关,如有侵权,请联系博主进行删除。







鲜花

握手

雷人

路过

鸡蛋

评论 (0 个评论)

facelist

您需要登录后才可以评论 登录 | 注册

 留言请遵守道德与有关法律,请勿发表与本文章无关的内容(包括告状信、上访信、广告等)。
 所有留言均为网友自行发布,仅代表网友个人意见,不代表本网观点。

关于我们| 反馈意见 | 联系我们| 招聘信息| 返回手机版| 美国中文网

©2024  美国中文网 Sinovision,Inc.  All Rights Reserved. TOP

回顶部