博客栏目停服公告
因网站改版更新,从9月1日零时起美国中文网将不再保留博客栏目,请各位博主自行做好备份,由此带来的不便我们深感歉意,同时欢迎 广大网友入驻新平台!
美国中文网
2024.8.8
|
This article introduces doosan DL350-5 Loader Clutch -KV and KR Disassembly
2023.07 Doosan DMS-5 Data Monitoring System Diagnostic Software
1. Squeeze rectangular ring out (Arrow).
NOTE: The following figures show the disassembly of
Clutch -KV.The disassembly of Clutch -KR is similar .
2. Pull tapered roller bearing from the sha ft.
3. Remove opposite tapered roller bearing accord ingly. (S)Grab sleeve -5873001 057
(S)Grab sleeve -5873001059
(S)Basic set-5873001000
4. 4. Squeeze retaining ring out.
Separate plate carrier from the shaft.
(S) ThreeOleg puller-5870970003
Doosan Diagnostic Tool UVIM Support Doosan Excavators High Quality
6.
Squeeze retaining ring out and remove plate pack.
7.
Preload compression spring, squeeze retaining ring out and remove components.
(S) Assembly aid -5870345088
8.Lift piston using compressed air out of the cylinder bore and remove it.
9. Remove both O-rings (Arrows).
HA9M2045
Figure 151
10. Lift idler gear a bit using pry bars (Figure 153).
11. Apply puller and separate idler gear from the clutch shaft
(Figure 154).
12.Squeeze retaining ring out and remove ball bearing.
The disassembly of Clutch -KR has to be carried out accordingly.
NOTE: The disassembly of Clutch -KR has to be carried out accordingly.
Doosan Machine Engine Diagnostic Software Package 2024 One PC Installation