注册 登录
美国中文网首页 博客首页 美食专栏

lucas88的个人空间 //www.sinovision.net/?642492 [收藏] [复制] [分享] [RSS]

x

博客栏目停服公告

因网站改版更新,从9月1日零时起美国中文网将不再保留博客栏目,请各位博主自行做好备份,由此带来的不便我们深感歉意,同时欢迎 广大网友入驻新平台!

美国中文网

2024.8.8

分享到微信朋友圈 ×
打开微信,点击底部的“发现”,
使用“扫一扫”即可将网页分享至朋友圈。

Caterpillar 311F LRR - JFT Crawler Excavator Engine Oil Cooler Installation

已有 253 次阅读2024-5-5 05:20 |系统分类:科技教育| CATERPILLAR 分享到微信

This article describes  Caterpillar 311flrr - JFT crawler excavator engine oil cooler installation


CAT Caterpillar ET 3 Diagnostic Adapter 317-7485/478-0235 Diagnostic Tool-high quality

 
Engine oil cooler-mounting


Installation steps

1. Ensure that all parts are not worn or damaged. If necessary, replace all worn or damaged parts. 2. If necessary, follow steps 2.a to 2.d to assemble the engine oil cooler. a. Ensure that the engine oil cooler base (12) is clean without damage and blockage. If the engine oil cooler base (12) is damaged or blocked, replace it. b . Ensure that the housing (10) is clean and without damage . If the housing (10) is damaged, replace it. c . Position the new gasket (11) on the engine oil cooler base (12). Install the engine oil cooler base (12) on the housing (10). d. Install the bolts (13) and bolts (14) to the oil cooler assembly (3). Tighten the bolts (13) and the bolts (14) to a torque of 25N-m (221 lbin). Caterpillar 18 Digits Factory Password Calculator One-Time Calculate Service 3. Clean the cylinder block sealing pad surface. 4. Position the new gasket (4) to the engine oil cooler. 5. Install the engine oil cooler assembly (5) to the cylinder block. Install bolts (1 ) to the oil cooler assembly (3). Note: Ensure that different lengths of bolts are installed in the correct position. 6. Tighten the bolts (3) to a torque of 25 Nm (221 Ib in) in the order shown in Figure 2. 7. Position the bracket (9) on the engine oil cooler (3). Install bolts (8) onto the bracket (9). Tighten the bolts to a torque of 15 Nm (133 Ib in). 8. Install the booster chamber cover (4). For the correct steps, refer to Disassembly and Assembly, "Turbocharger-Install". 9. If necessary, install the turbocharger drain pipe assembly. For the correct steps, refer to Disassembly and Assembly, "Turbocharger- Install". 10. Install the new O-ring seal (7) (not shown) onto the tube assembly (5). 11. Install pipe assembly (5) to the engine oil cooler (3). 12. Install the bolts ( 6) to the tube assembly (5). Tighten the bolts to a torque of 25 Nm (221 lb in). 13. Connect the coolant hose to the tube assembly (5). Caterpillar ET 2024A & 2023C & 2019C Electronic Technician Diagnostic Software Download and Installation 14. Install the alternator. For the correct steps, see Disassembly and Assembly, "Alternator-Installation". 15. Fill the cooling system to the correct liquid level. Refer to the Operation and Maintenance Manual, "Cooling System Coolant- Replace" for the correct steps. 16. If the engine oil is drained during the engine oil cooler removal steps, refill the lubrication system. For the correct steps, refer to the Operation and Maintenance Manualbook, "Engine Oil and Filter-Replacement".






















































17. Check the engine lubricating oil oil level. Refer to the Operation and maintenance Manual, "Engine Oil Level-Check" for the correct procedures.

免责声明:本文中使用的图片均由博主自行发布,与本网无关,如有侵权,请联系博主进行删除。







鲜花

握手

雷人

路过

鸡蛋

评论 (0 个评论)

facelist

您需要登录后才可以评论 登录 | 注册

 留言请遵守道德与有关法律,请勿发表与本文章无关的内容(包括告状信、上访信、广告等)。
 所有留言均为网友自行发布,仅代表网友个人意见,不代表本网观点。

关于我们| 反馈意见 | 联系我们| 招聘信息| 返回手机版| 美国中文网

©2024  美国中文网 Sinovision,Inc.  All Rights Reserved. TOP

回顶部