注册 登录
美国中文网首页 博客首页 美食专栏

lucas88的个人空间 //www.sinovision.net/?642492 [收藏] [复制] [分享] [RSS]

x

博客栏目停服公告

因网站改版更新,从9月1日零时起美国中文网将不再保留博客栏目,请各位博主自行做好备份,由此带来的不便我们深感歉意,同时欢迎 广大网友入驻新平台!

美国中文网

2024.8.8

分享到微信朋友圈 ×
打开微信,点击底部的“发现”,
使用“扫一扫”即可将网页分享至朋友圈。

Perkins 2806F Engine Relay (ARD Nozzle Heater) Removal Instructions

已有 324 次阅读2024-4-14 10:05 |系统分类:科技教育分享到微信

This article introduces the Perkins 2806F engine relay (ARD nozzle heater) removal instructions

2023A& 2022A Perkins EST Electronic Service Tool Diagnostic Software Full Provide Installation Service
1. Turn the battery disconnect switch to the OFF position.












2. Cut cablestraps (3) from harness assembly (4)

Note: Note position of cable straps. Ensure that all

cablestraps are removed for the harness

assemblies.

3. Slide the locking tab for the harness assembly (4) into the unlocked position.

4. Disconnect harness assembly (4) from harness assembly connection (5) for the clean emission module.

5. Remove bolts ( 1) and spacers.

Note: Note position and orientation of any brackets that are attached to the relay assembly.

6. Remove relay assembly (2) from the bracket for the clean emission module.

7. If necessary, follow Step 7.a through Step 7.b to remove relay assembly (2) from bracket (6).

a. Remove bolts (7) from relay assembly (2) and remove bracket (6).

Note: Note the orientation of the bracket for

installation purposes.

b. Remove relay (2) from bracket (6).

Installation Procedure

1. Ensure that all components are clean and free

from wear and damage. If necessary, replace any components that are worn or damaged.




Perkins SPI2 Version 2018A Service & Parts Catalogue Software




Typical example

2. If necessary, follow Step 2.a through Step 2.b to install relay assembly (2) to bracket (6).

a. Position relay assembly (2) onto bracket (6).

Note: Ensure the correct orientation of the relay assembly on the bracket.

b. Install bolts (7) to relay assembly (2) and tighten the bolts to a torque of 9 N·m (80 lb in).

3. Position brackets onto relay assembly (2) and install bolts (1) and spacers.

Note: Ensure correct position and orientation of the brackets.

4. Position relay assembly (2) onto the bracket for the clean emission module.

Note: Ensure that the relay assembly is correctly oriented on the clean emission module bracket.

5. Tighten the bolts to a torque of 12 N·m ( 142 lb in).

6. Connect harness assembly (4) to harness

assembly connection (5) for the clean emission module.

7. Install cablestraps (3) to harness assembly (4).

Note: Ensure that cablestraps meet the Original Equipment Manufacturer (OEM) specification.

8. Turn the battery disconnect switch to the ON

position.
Perkins Engine ECM ECU Flash Files Collection Download


免责声明:本文中使用的图片均由博主自行发布,与本网无关,如有侵权,请联系博主进行删除。







鲜花

握手

雷人

路过

鸡蛋

评论 (0 个评论)

facelist

您需要登录后才可以评论 登录 | 注册

 留言请遵守道德与有关法律,请勿发表与本文章无关的内容(包括告状信、上访信、广告等)。
 所有留言均为网友自行发布,仅代表网友个人意见,不代表本网观点。

关于我们| 反馈意见 | 联系我们| 招聘信息| 返回手机版| 美国中文网

©2024  美国中文网 Sinovision,Inc.  All Rights Reserved. TOP

回顶部