博客栏目停服公告
因网站改版更新,从9月1日零时起美国中文网将不再保留博客栏目,请各位博主自行做好备份,由此带来的不便我们深感歉意,同时欢迎 广大网友入驻新平台!
美国中文网
2024.8.8
热度 1|
This article introduces the disassembly of Doosan DX340LC-5 excavator swing reduction gear
1. Park on firm and level ground .
2. Lower front attachment ( bucket ) to ground .
3. Shut down engine .
4. Set safety lever on " RELEASED " position .
Doosan Diagnostic Tool UVIM Support Doosan Excavators High Quality
5. Turn starter switch to "I" ( ON ) position .
WARNING! |
If engine must be running while performing maintenance, always use extreme caution. Always have one person in cab at all times . Never leave cab with engine running. |
6. Fully stroke work levers ( joysticks ) in all directions to
relieve any pressure from accumulat ors.
7. Set safety lever on " LOCK " position .
8. Turn key to "O" ( OFF ) position and remove from starter
switch.
9. Hang a maintenance warning tag on controls .
10. Disconnect negative (-) battery cable leading to frame from
battery.
2023.07 Doosan DMS-5 Data Monitoring System Diagnostic Software
11. Tag and disconnect hoses from swing motor (1, Figure 3 ).
Plug and cap hoses and ports to prevent contaminat ion
from entering hydraulic system or component.
12. Disconnect tube (2) from drain cock (3) and hose fitting (7)
from fill hole.
13. Remove twelve bolts and washers (4, Figure 3 ) holding
swing reduction gearbox (5) to frame .
14. Using a suitable lifting device, slingswing motor (1, Figure
3 )andremoveswingmotorandreductiongearbox(5)as
an assembly from unit.
NOTE : A drain cock (3 , Figure 3 ) and tube are on side
of gearbox. Be careful not to damage valve or
tube .
NOTE : There are two alignment pins (6 , Figure 3 ), one
on each side of reduction gearbox