注册 登录
美国中文网首页 博客首页 美食专栏

lucas88的个人空间 //www.sinovision.net/?642492 [收藏] [复制] [分享] [RSS]

x

博客栏目停服公告

因网站改版更新,从9月1日零时起美国中文网将不再保留博客栏目,请各位博主自行做好备份,由此带来的不便我们深感歉意,同时欢迎 广大网友入驻新平台!

美国中文网

2024.8.8

分享到微信朋友圈 ×
打开微信,点击底部的“发现”,
使用“扫一扫”即可将网页分享至朋友圈。

How to Dismantle Doosan Excavator Pump

已有 353 次阅读2023-10-15 10:25 |系统分类:科技教育分享到微信

How to dismantle Doosan  DX 60-9C excavator pump

 Disassembly of the plunger pumps and the gear pumps

1. Remove the bolts (M1025L: 2), because the decomposition plunger pump and gear pump have O-ring on the joint surface, please be careful when separating.

· Tool: 8mm (factory —)

Doosan Diagnostic Tool UVIM Support Doosan Excavators High Quality 

 

 Figure  30

 2. Remove the coupling spline sleeve.

   

  Figure  31

 Disassemble the plunger pump

1. Remove the inner hexagon bolt (33,34) and separate the pump from the housing

End cover (21).

(M1230:3) (M1255:1)

· Tool: 10mm (factory —)

  

2. When removing the end cover, please separate in the horizontal direction. When the b is difficult to remove, please tap it gently with a plastic hammer.

 2020 Doosan Daewoo Excavator Operation and Repair Manual PDF

 

 3. Status after the pump end cover is removed.

 

 

 

4. Remove the O-ring (3 0,3 1).

 

 


 

5. Remove the adjustment spring.

 

    6. Remove the spring seat from the pump housing (51).

 

       

7. Remove the plunger plug assembly.

 

 

         

8. Use the hook to remove the slide track plate.

 

 

  2022.11 Doosan DMS-5 3.0.5 Data Monitoring System Diagnostic Software

9. Remove the clamp spring with the clamp (7).

  

   10. Remove the front cover (8).

 

 

       11. Remove the O-ring.

 

 

      14. Remove the bearing pads (14).

 

 

    15. Remove the bearing.

 

 

       

16. Remove the inclined plate.

 

 

    17. Remove the flow distribution plate.

 

 18. Remove the card spring (28).

 

 

         

19. Remove the filter screen (26).

 

 

 

  

20 Remove the retaining bolt (67) for the flow adjustment valve block (M8 x

25L: 2s)

If the bolt is coated with Loctite before assembly, please do not remove the cover bolt if not necessary.

· Tool: 6mm (factory 1)

 

 

   Doosan Diagnostic Tool DDT G2 SCAN( ECU ,DCU)Software 2016

21. Separate and adjust the valve body. Because the binding surface has an O-ring, please be careful.

 

 22. Remove the flow adjustment valve spool.

 

 

    23. Remove the 3 disc springs and spring seats.

 

  

24. Remove the inner hexagon bolts and separate the cover bolts

(M830L: 2s)

· Tool: 6mm (factory —)

 

   

  26. Remove the overflow valve. Remove the inner hexagon bolts.

Note: Disassemble this part only if required.

· Tool: 24 mm (2e)

 

 

  

27. Remove the adjustment bolts

 Note: Due to the valve core.

 

 

   28. Separation spring.

 

 

    

29. Remove the spool.

 30. Disassembly of the drive shaft

 Remove the clamp spring and the bearing

 

 

 

      31. It may be difficult to remove the bearings and can be struck with a plastic hammer.

 

 


免责声明:本文中使用的图片均由博主自行发布,与本网无关,如有侵权,请联系博主进行删除。







鲜花

握手

雷人

路过

鸡蛋

评论 (0 个评论)

facelist

您需要登录后才可以评论 登录 | 注册

 留言请遵守道德与有关法律,请勿发表与本文章无关的内容(包括告状信、上访信、广告等)。
 所有留言均为网友自行发布,仅代表网友个人意见,不代表本网观点。

关于我们| 反馈意见 | 联系我们| 招聘信息| 返回手机版| 美国中文网

©2024  美国中文网 Sinovision,Inc.  All Rights Reserved. TOP

回顶部