注册 登录
美国中文网首页 博客首页 美食专栏

lucas88的个人空间 //www.sinovision.net/?642492 [收藏] [复制] [分享] [RSS]

x

博客栏目停服公告

因网站改版更新,从9月1日零时起美国中文网将不再保留博客栏目,请各位博主自行做好备份,由此带来的不便我们深感歉意,同时欢迎 广大网友入驻新平台!

美国中文网

2024.8.8

分享到微信朋友圈 ×
打开微信,点击底部的“发现”,
使用“扫一扫”即可将网页分享至朋友圈。

How to Disassemble Travel Motor Speed of Doosan Hydraulic Excavator Reducer

已有 522 次阅读2023-9-25 03:56 |系统分类:科技教育分享到微信

 How to disassemble travel motor speed of Doosan DX520LC and DX480LC Hydraulic Excavator Reducer

Doosan Diagnostic Tool UVIM Support Doosan Excavators High Quality
 1. Drain gear oil and remove travel motor and O-ring.
2. Remove motor flange (8 socket bolts, M16 x 35). Figure 64.

 
3. Remove O-ring from motor flange. Figure 65.

 


 4. Remove O-ring from hub groove. Figure 66.

  


5. Attach disc (B, Figure 67) to spring retainer; fasten pusher (A) to hub and install screw rod (C).67


2022.11 Doosan DMS-5 3.0.5 Data Monitoring System Diagnostic Software
6. Remove retaining ring from hub groove using pliers. Figure 68.





7. Remove jig and retaining ring. Figure 69.





8. Remove spring retainer. Figure 70.




9. Pull spring from groove. Figure 71.





10. Blow air into brake port hole and remove brake piston using pliers. Figure 72.






11. Remove brake shaft. 73

 

 


 12. Remove disc. Figure 74.


13. Remove O-ring and backup ring. Figure 75.

Doosan Diagnostic Tool DDT G2 SCAN( ECU ,DCU)Software 2016

 


 14. Turn reduction gear assembly over and remove 2 plugs (M22 x 1.5). Figure 76.

 

 

 15. Remove 16 socket bolts (M14 x 40). Figure 77.

 

 
16. Remove end cover, using puller. Figure 78.

 


 

 17. Remove O-ring from end cover groove. Figure 79.

 


 
18. Remove first sun gear. Figure 80.

 


 19. Remove first planetary gear assembly. Figure 81.

 


 
20. Remove second sun gear. Figure 82

 


 21. Remove second planetary gear assembly. Figure 83.

 


 22. Remove third sun gear. Figure 84

 


 23. Remove bolts (4, M 30 x 150) from third planetary gear assembly. Figure 85.

 


 24. Remove bolts. Figure 86.

 


  
25 Separate hub from reduction gear housing, using press and stopper. Figure 87.

 


 NOTE: Do not remove main ball bearing.

 
26. Remove third shift assembly from hub. Figure 88.

 

 
27. Remove bushing from hub using a jig. Figure 89

 


28. Remove bearing inner race and spacer from hub, using puller. Figure 90.

 

 

 29. Remove gasket. Figure 91.

 

 Doosan products

免责声明:本文中使用的图片均由博主自行发布,与本网无关,如有侵权,请联系博主进行删除。







鲜花

握手

雷人

路过

鸡蛋

评论 (0 个评论)

facelist

您需要登录后才可以评论 登录 | 注册

 留言请遵守道德与有关法律,请勿发表与本文章无关的内容(包括告状信、上访信、广告等)。
 所有留言均为网友自行发布,仅代表网友个人意见,不代表本网观点。

关于我们| 反馈意见 | 联系我们| 招聘信息| 返回手机版| 美国中文网

©2024  美国中文网 Sinovision,Inc.  All Rights Reserved. TOP

回顶部