注册 登录
美国中文网首页 博客首页 美食专栏

lucas88的个人空间 //www.sinovision.net/?642492 [收藏] [复制] [分享] [RSS]

x

博客栏目停服公告

因网站改版更新,从9月1日零时起美国中文网将不再保留博客栏目,请各位博主自行做好备份,由此带来的不便我们深感歉意,同时欢迎 广大网友入驻新平台!

美国中文网

2024.8.8

分享到微信朋友圈 ×
打开微信,点击底部的“发现”,
使用“扫一扫”即可将网页分享至朋友圈。

How to Installation the Injection Pump of The New Holland Engine

已有 616 次阅读2023-3-11 09:31 |系统分类:科技教育分享到微信

 Installation of Injection Pump of New Holland_b115 Engine
STEP 1

2023 CASE New Holland Electronic Service Tools (CNH EST v9.7Up3) Engineering Diagnostic Software


Replace gasket on pump mounting flange.


STEP 2


Install pump and tighten the three mounting nuts.




STEP3


Install lock washer and nut, torque nut to 66 to 70
lb-ft (90 to 95 Nm).
WARNING: Use caution when installing nut and
washer they can be dropped inside of the engine.




STEP4


Apply Loctite 5205 to the surface of the cover plate,
install cover plate and mounting bolts, tighten bolts.




STEP 5

Connect wire to temperature sensor.




STEP 6

Connect the fuel feed line to the injector pump.
SECTION 10 - ENGINE - CHAPTER 1 7
Issued 12-04



STEP 7


Remove covers from lines and fittings. Connect fuel
injector lines (1), connect fuel return line (2), and
boost line (3) to the pump. 



STEP 8

CNH DPA5 Adapter New Holland Heavy Duty mechanical Diagnostic Tool


Install oil filler tube (3), mechanical fuel pump (2),
and fuel filter (1) on the engine.



STEP 9



Install the injector line retaining bracket mounting
bolts.




STEP 10

Loosen injector pump locking bolt and install the
slotted plate, tighten the locking bolt to 9 to 10 lb-ft
(12 to 14 Nm).



STEP 11



Make sure locking pin is disengaged from gear.




STEP 12
Remove the engine turning tool and install the
starter.




STEP 13


If the machine has only one battery, connect the
negative battery cable to the battery. Install the
battery cover.




STEP 14



Install grounding cable (2) onto the terminal. Install
the jumper cable (3) on the terminal and start the
terminal nut (1) onto the terminal. Tighten the
terminal nut.




STEP 15



Install the front rocker arm cover and injector line
retaining bracket mounting bolt.




STEP 16



Install the throttle cable into the bracket and tighten
the jam nut.




STEP 17



Install and thighten the two throttle arm mounting
bolts.



STEP 18


New Holland AG& CE Service Manuals PDF 2019Download (170GB)

Connect the power lead to the injector pump.




STEP 19
Actuate the lever on the mechanical fuel pump to
prime the fuel system.


STEP 20
Start the machine and check for fuel leaks, check
and adjust throttle linkage as needed

免责声明:本文中使用的图片均由博主自行发布,与本网无关,如有侵权,请联系博主进行删除。







鲜花

握手

雷人

路过

鸡蛋

评论 (0 个评论)

facelist

您需要登录后才可以评论 登录 | 注册

 留言请遵守道德与有关法律,请勿发表与本文章无关的内容(包括告状信、上访信、广告等)。
 所有留言均为网友自行发布,仅代表网友个人意见,不代表本网观点。

关于我们| 反馈意见 | 联系我们| 招聘信息| 返回手机版| 美国中文网

©2024  美国中文网 Sinovision,Inc.  All Rights Reserved. TOP

回顶部