注册 登录
美国中文网首页 博客首页 美食专栏

lucas88的个人空间 //www.sinovision.net/?642492 [收藏] [复制] [分享] [RSS]

x

博客栏目停服公告

因网站改版更新,从9月1日零时起美国中文网将不再保留博客栏目,请各位博主自行做好备份,由此带来的不便我们深感歉意,同时欢迎 广大网友入驻新平台!

美国中文网

2024.8.8

分享到微信朋友圈 ×
打开微信,点击底部的“发现”,
使用“扫一扫”即可将网页分享至朋友圈。

How to Check/Adjust Caterpillar TH360B Telehandler Boom Chain Tension

已有 674 次阅读2023-3-4 09:42 |系统分类:科技教育| Engineering, Machinery, Maintenance, and, Repair 分享到微信

How to Check/Adjust Caterpillar TH360B Telehandler Boom Chain Tension

 caterpillarTH360B Telehandler Boom Chain Tension -Check/Adjust


SLE1-Up

You must read the warnings and instructions
which are contained in the safety section of this
manual. Before you perform any operation or
maintenance procedures ensure you understand the
warnings and instructions. 

Caterpillar ET 2022A & 2019C Electronic Technician Diagnostic Software
Check Condition
1. Park the machine on level ground. Fully retract the
   boom and lower the boom.


2. Remove the cover from the rear of the chassis.


3. A limited inspection of the chains can be made
   through the rear of the boom. The boom extension
   chain can be inspected by fully extending the
   boom and looking on top of the intermediate
   section. If the chains are corroded, the chains
   must be removed from the boom for cleaning and a
  full inspection. If the chains require lubricant, the
  chains must be removed from the boom for
  cleaning and a full inspection. Refer to the
  Hydraulic System Systems Operation, Testing and
  Adjusting, "Boom Chain - Clean/Inspect/Lubricate"
  or consult your Caterpillar dealer

、4. Set the minimum distance to 224 mm (8.8 inch)
   between boom section 2 and boom section 3. The
   maximum allowable distance is 234 mm (9.2 inch).
   Tighten extension chain (1) in order to move
   section 3 outward. Tighten retraction chain (2) in
   order to move section 3 inward. If the distance is
   significantly more than 224 mm (8.8 inch), slacken
   both chains and refer to Step 1.

Caterpillar CAT Factory Password Calculator Generator 10 Digits VM Version


5. After setting the distance to the required tolerance,
  tighten the extension chain to 20 Nm (15 lb ft).


6. Tighten the retraction chain to 18 Nm (13 lb ft).


7. Tighten the extension chain to 105 ± 5 Nm
   (77 ± 4 lb ft).


8. Tighten the retraction chain to 70 ± 5 Nm (52 ± 4
   lb ft).


9. Extend the boom and retract the boom several
   times. Check the torque for the extension chain.
   Check the torque for the retraction chain.


10. Install the locknut for the extension chain. Torque the
   locknut for the extension chain to 105 ± 5 Nm (77 ±
4 lb ft).

10.2021 Caterpillar SIS EPC+Service Manual download & Full Installation Service
  11. Install the locknut for the retraction chain. Torque the
  locknut for the retraction chain to 70 ± 5 Nm (52 ±
4 lb ft).


  12. Check the shackles on both chains. If necessary,
  adjust the shackles in order to set the shackles
  horizontally.


13. Remove the stand and lower the boom.

免责声明:本文中使用的图片均由博主自行发布,与本网无关,如有侵权,请联系博主进行删除。







鲜花

握手

雷人

路过

鸡蛋

评论 (0 个评论)

facelist

您需要登录后才可以评论 登录 | 注册

 留言请遵守道德与有关法律,请勿发表与本文章无关的内容(包括告状信、上访信、广告等)。
 所有留言均为网友自行发布,仅代表网友个人意见,不代表本网观点。

关于我们| 反馈意见 | 联系我们| 招聘信息| 返回手机版| 美国中文网

©2024  美国中文网 Sinovision,Inc.  All Rights Reserved. TOP

回顶部