注册 登录
美国中文网首页 博客首页 美食专栏

lucas88的个人空间 //www.sinovision.net/?642492 [收藏] [复制] [分享] [RSS]

x

博客栏目停服公告

因网站改版更新,从9月1日零时起美国中文网将不再保留博客栏目,请各位博主自行做好备份,由此带来的不便我们深感歉意,同时欢迎 广大网友入驻新平台!

美国中文网

2024.8.8

分享到微信朋友圈 ×
打开微信,点击底部的“发现”,
使用“扫一扫”即可将网页分享至朋友圈。

How to Remove the Timing Gear of Isuzu Engine (4JH1 type)

已有 954 次阅读2023-2-8 10:30 |系统分类:科技教育分享到微信

  How to remove the timing gear of Isuzu engine (4JH1 type)
https://www.heavydutydiag.com/product/isuzu-idss-diagnostic-adapter-system/

            



1. Disconnect the battery cable negative terminal.


2. Drain the coolant.


3. Remove the radiator.Refer to "Radiator"in Section 6B Engine Cooling.


4. Remove the power steering pump and bracket assembly.
Refer to "Engine Assembly"in this Section.


5. Remove the AC generator drive belt.
Loosen AC Generator mounting bolt (under size) and adjust plate lock bolt, and remove the drive belt.


6. Remove the cooling fan assembly.
Remove clamp nut, and remove cooling fan assembly, distant pipe, and fan pulley.


7. Remove the crankshaft damper pulley.


8. Remove the timing gear case cover.


9. Remove the idler gear.
a. Measure the camshaft timing gear backlash and the crankshaft timing gear backlash before removing the idler gear.
b. Measure the idler gear end play before removing the idler gear.
LNWC1BSH006401

https://www.heavydutydiag.com/product/isuzu-g-idss-diagnostic-service-system-03-2022/



NOTE:
 Refer to the following items for details on the backlash and end play measurement procedures.
10. Timing Gear Backlash Measurement 


a. Set a dial indicator to the timing gear to measured.
Hold both the gear to be checked and the adjoining gear stationary.

 



   03

 

b. Move the gear to be checked as far as possible to both the right and the left.
Take the dial indicator reading.
If the measured value exceeds the specified limit, the timing gear must be replaced.
https://www.heavydutydiag.com/product/isuzu-us-idss-diagnostic-service-system-09-2021/




11. Idler Gear "A"End Play Measurement a. Insert a feeler gauge between the idler gear and the thrust collar to measure the gap and determine the idler gear end play.
b. If the measured value exceeds the specified limit, the thrust collar must be replaced.






12. Removeheidlegear.
13. Remove the fuel supply pump.
Refer to "Fuel Supply Pump"in Section 6C, Engine Fuel.
14. Remove the camshaft timing gear a. Use a dial indicator to measure the camshaft end play. This must be done before removing the camshaft gear.
If the camshaft end play exceeds the specified limit, the thrust plate must be replaced.

https://www.heavydutydiag.com/product/isuzu-e-idss-diagnostic-service-system-03-2021/




b. Remove the camshaft timing gear bolt from the camshaft.
NOTE: Hold the camshaft stationary to prevent the camshaft from turning.
c. Use the universal puller (1) to pull out the camshaft timing gear (2).
Special tool: Universal Puller: 5-8521-0002-0d. Remove the thrust plate (3).

https://www.heavydutydiag.com/product/isuzu-linkone-epc-css-net-05-2020/



Use the crankshaft timing gear remover (1) to remove the crankshaft gear (2).
SST Crankshaft Timing Gear Remover: 5-8840-
2057-0




免责声明:本文中使用的图片均由博主自行发布,与本网无关,如有侵权,请联系博主进行删除。







鲜花

握手

雷人

路过

鸡蛋

评论 (0 个评论)

facelist

您需要登录后才可以评论 登录 | 注册

 留言请遵守道德与有关法律,请勿发表与本文章无关的内容(包括告状信、上访信、广告等)。
 所有留言均为网友自行发布,仅代表网友个人意见,不代表本网观点。

关于我们| 反馈意见 | 联系我们| 招聘信息| 返回手机版| 美国中文网

©2024  美国中文网 Sinovision,Inc.  All Rights Reserved. TOP

回顶部