博客栏目停服公告
因网站改版更新,从9月1日零时起美国中文网将不再保留博客栏目,请各位博主自行做好备份,由此带来的不便我们深感歉意,同时欢迎 广大网友入驻新平台!
美国中文网
2024.8.8
|
This article mainly introduces Removal and Installation of the Isuzu Control Lever Assembly,Control Cable and Associated Parts
Removal
1.Disconnect the batery ground cable.
2.Remove instrument panel driver lower cover assembly.
3.Remove knee Bolster Driver Panel Assembly.
4.Remove lower cluster assembly.5.Remove meter cluster assembly.
ORefer to Instrument Panel Assembly and Cross Beam Assembly in Body Structure section.
6.Remove instrument panel lower center cover assembly.
7.Remove glove box.
8.Remove the control lever attaching screws.
9.Pull the control leverassembly out and disconnect the fan switch and air conditioning switch connectors.
10. Remove the illumination bulb holder.
11. Remove fan control lever and/or air conditioning
(AC) switch connector.
OPull the A/C switch out and disconnect the connectors.
12.Remove control lever assembly.
13.Disconnect control cables at each unit side.
Installation To install, follow the removal steps in the reverse order, noting the following points:
1. Adjust the control cable.
OAir source control cable.
1. Slide the control lever to the left("CIRC"
position).
2. Connect the control cable at the "CIRC"position of the link unit of the blower assembly and secure it with the clip.
OTemperature control cable.